40’ x 85’ x 14′ Foundation in an existing Building, Trenches and Multiple Elevations requiring 700 Cubic Yards of Concrete with 36.4 Tons of Reinforcing Steel and 218 individually grouted Anchor Bolts.
Due to the proximity to existing building foundations, Soil Nailing (Soil Retention) was employed to stabilize Building Foundations and minimize Excavation during construction.
Installing Re bar for 40x85x14 Foundation in Existing Building Trenches and Multiple Elevations Boring Bar Foundation Manitowoc Cranes Port Washington WI Boring Bar Foundation Manitowoc Cranes Port Washington WI-2 Boring Bar Foundation Manitowoc Cranes Port Washington WI-3 Concrete Truck Set up and Ready for First Pour at Manitowoc Crane in Port Washington Soil Nailing employed to Stabilize Building Foundations and Minimize Excavation First Pour for Boring Bar Foundation Manitowoc Cranes Port Washington First Pour for Boring Bar Foundation Manitowoc Cranes Port Washington-2