Pre-Engineered Metal Buildings:
Manitowoc Tool & Manufacturing, Manitowoc, WI – Addition, Vits Drive Facility, 2024
Hamann recently broke ground on a 59,000-square-feet Ceco pre-engineered building addition for Manitowoc Tool & Manufacturing (MTM) in Manitowoc’s I-43 Technology & Enterprise Campus. Due to MTM’s tremendous growth in the past year, the addition to the building will enable the transitioning from a distribution center into a production facility as the total plant size is increased to more than 101,000 sq. ft. Two additional interior loading docks, a restroom, and an office/conference room mezzanine will be added. Scheduled for an August completion, the addition is custom-designed to blend seamlessly with the building Hamann constructed in 2023.
Manitowoc Tool and Manufacturing specializes in high-volume metal stamping, metal fabrication, tool and die, robotic welding, CNC machining, water jet cutting, laser cutting, and value-added assembly.
Manitowoc Tool & Manufacturing Website
Manitowoc Tool & Manufacturing Original Facility Construction
Manitowoc Tool & Manufacturing 2017 Addition
Manitowoc Tool & Manufacturing 2021 Addition
Manitowoc Tool & Manufacturing, Vits Drive, Original Facility
MTM Addition – Concrete Slab Pour – 2
MTM Addition – Concrete Slab Pour – 1
MTM Addition – Concrete Slab Pour – 3
MTM Groundbreaking for Vits Drive Addition under construction
MTM Elevations for Vits Drive Addition under construction





