Industrial / Manufacturing Facilities:

Kaysun Corporation, Manitowoc, WI

31,300-Square-Foot Factory/Warehouse Addition – provided extra warehouse space, room for new production equipment, and enhanced productivity. Merged two buildings and extended an existing bridge crane while maintaining access through the connecting link.

“Hamann did a fantastic job for us on our much needed building expansion. They were extremely thorough in all phases of the project from design thru final completion. The end result exceeded our expectations.” – Ben Harrison, Kaysun President and CEO.

“Eric Doucha (Hamann Job Site Foreman) made the building process look really easy and delivered quick and thoughtful solutions to unexpected circumstances throughout the project. The project was completed on time.” – Keith Philippi, Kaysun Manufacturing Engineer.

——————
Previous Jobs:
Construction of New Facility, connected by link to Main Offices and Plant. Included Attractive Offices and Manufacturing Space. Located in Manitowoc’s I-43 Industrial Park.

“The job was completed on time and the Hamann team is to be commended for its professionalism, politeness, and expertise.” – Kaysun

Kaysun Corporation